Repository
← Today

Operations 02

Design & Decisions

Is design converting cleanly, and where does it cause rework?

Not connected10 measures specified

What is blocking this surface

No design event is dated. Revision rounds, approval cycles and handoff times all need a record per proposal, and proposals live in files rather than records.

Already exists — do not rebuild
The Designer Coordination Packs define the gates and the acceptance test in detail. What is missing is the record, not the standard.

The three-impact gate

NOT_CONNECTED — the three impacts are not fields anywhere

A decision must not reach customer approval until all three impacts are recorded: usage, cost and visual.

usage impactcost impactvisual impact

It converts a matrix that is currently a way of thinking into a gate that can refuse. Two of three completed is not an opinion about readiness — it is a stop.

Measures specified

none computable — not connected
MeasureState
Brief-to-first-proposal timeNot connected
First-presentation approval rateNot connected
Average revision roundsNot connected
Drawing approval cycleNot connected
Selections matched to an approved SKUNot connected
Selections matched to a verified supplierNot connected
Specification completenessNot connected
Design-to-quotation handoff timeNot connected
Approved-design versus installed-result varianceNot connected
Design decisions that caused rework, delay or margin lossNot connected